top of page
Clear Creek Firehouse #7
Homeland Security Project

Construction Progress
A visual documentation of the Firehouse #7 build process, showcasing the integration of advanced modular precast systems and architectural precision in Alice, CO.
Technical Specifications

Environmental HVAC
Specialized ventilation and air filtration systems designed for hazardous material mitigation within emergency vehicle bays.

Solar Resilience
Roof-mounted pre-fitted photovoltaic arrays providing off-grid operational capability during regional grid failures.

Hardened Structure
Ultra-high performance precast concrete panels engineered to resist seismic activities and extreme thermal variations.

Radiant Systems
Integrated hydronic floor mass heating systems utilizing earth energy to maintain high-efficiency operational temperatures.
bottom of page





